Collective Storm Drainage Improvement Project - Series AD
Collective SDIP Series AD consists of four projects: Tipperary Place 4213: This project is a rehabilitation of an existing 60 linear foot 8' x 6' RCBC. The rehabilitation consists of four different methods including addressing exposed rebar, concrete elamination, and vegetation removal. All these methods will be addressed from inside the culvert or directly Infront of the headwalls. Randolph Road 4023: This project will address failing infrastructure in Randolph Road. The project will remove and replace approximately 234 LF of 15" RCP. Water and Sewer relocations will be required. A phased traffic control plan will be required for improvements in Randolph Road right of way. Randolph Road 4600: This project will address failing infrastructure in Randolph Road and tail ditching at the outfall. The proposed plan will remove and replace approximately 102 LF of 18" RCP. Sewer relocation will be required. A phased traffic control plan will be required for improvements in Randolph Road right of way. Vail Avenue 2607: This project will install storm drainage infrastructure to a portion of Vail Avenue to better capture runoff. The proposed plan will install approximately 358 LF of 18" RCP, 36 LF of 24" RCP, and 10 structures. Approximately 500 LF of curb and gutter will be installed. Two sewer relocations will be required. The estimated cost for this project is $1,425,701.00.