Fishtrap Lake Intake Structure and Dam Rehabilitation; W91237-26-R-A020 RFP
Fishtrap lake intake structure and dam rehabilitation.
Description: Work consists of: soil erosion & sedimentation control, including obtaining the sesc permit for the project; staking and layout of proposed improvements, with support and confirmation from engineer temporary water control measures as required; repair or replacement of steel radial gates including removal of existing hoist equipment and replacement with new hoist frame, cleaning and coating existing steel gates; cured-in-place lining of existing corrugated metal pipe culvert outlets within the dam; right embankment repair; grading and riprap installation along the downstream toe of the dam with bedding stone, filter sand, drainage stone and filter fabric; repair of spillway concrete including shallow and deep repairs and crack injection and route/seal; turf restoration for all areas disturbed during construction; restoration of gravel access route, if disturbed during construction, related work.
City · MI, US
Original attachments and procurement documents tied to this bid.
Adjacent opportunities open for bidding right now.
Posted
Oct 9, 2026
Nov 6, 2026
Fishtrap lake intake structure and dam rehabilitation.
Rock Island County Forest Preserve District
Special DistrictIL
Posted
Oct 8, 2026
Oct 22, 2026
Project shall consist of the following work efforts mobilization, safe spillway access, removal of existing joint sealant and replacement in-kind, excavation of existing drainage rills [ref: plan], filter fabric, riprap (rr-5), partial depth concrete repair at spillway, crack sealing at spillway wall, cut of existing anchor bolts and slope restoration.
Pembina County Soil Conservation District
Special DistrictND
Posted
Oct 6, 2026
Nov 3, 2026
1 LS - mobilization; 1 LS - modify existing dam; 160 LF - floating silt curtain; 27 LF- access stairs; 4 ea - flat rock boulders (48'' TO 72'' dia.); 3,170 CY - nddot grade II riprap; 2,055 CY - riprap base; 443 CY borrow excavation; 1,112 LF - rock weir boulders (36" - 60" dia.); 1 LS - clearing and grubbing; 1 LS - seeding and mulching.
CityNC
Posted
Sep 23, 2026
Nov 5, 2026
Procurement of dam reconstruction services for the Camp Pond Dam, including spillway removal and installation, weir replacement, headwall construction, and riprap placement.