Buckland Elementary School Wastewater Improvements Project RFP
Posted
-
Oct 22, 2026
Project consists of sewer pump station to include at a minimum all Labor, Tools, Equipment, Materials and Supplies for the complete construction of One (1) 80 GPM Wastewater Duplex Pumping Station. Electrical installation of all equipment including automatic transfer switch and tie-in to permanent backup generator. Telemetry for level indication, pump temperature and moisture switches, and other required alarming features. Work includes approx 14,565 LF of 4" SDR-21 PVC force main; 165 LF of 4" DI force main; 390 LF of 8" steel casing; 140 LF of 4" I.D. directional bore.