CityOK
Posted
Oct 8, 2026
Oct 29, 2026
Phase I Redrilling of Production Well 46 and Drilling of New Production Well 71 RFP
Phase I redrilling of production well 46 and drilling of new production well 71.
Description: The project consists of drilling a municipal production well.
City · ID, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityOK
Posted
Oct 8, 2026
Oct 29, 2026
Phase I redrilling of production well 46 and drilling of new production well 71.
Deseret Public Infrastructure District
Special DistrictUT
Posted
Sep 25, 2026
Oct 17, 2026
Project consists of drilling a new 16" drinking water production well (well) utilizing reverse circulation or approved drilling methods. The work consists of drilling, completion, development, and test pumping a 16" cased municipal production well to a depth of approx 1,000 FT below ground surface.
South Carolina Department of Natural Resources
State AgencySC
Posted
Oct 21, 2025
Nov 3, 2026
The South Carolina Department of Natural Resources is requesting quotes to drill a 600-foot well with a 2HP setup at 1012 Ramsey Grove Rd, Georgetown, SC 29440. The full scope of work and response instructions are available via the buyer-managed posting on the South Carolina Business Opportunities site or by contacting the listed buyer contact.
CityCT
Posted
Sep 28, 2026
Oct 19, 2026
To provide services for the installation of two (2) permanent water quality monitor wells. The site location is along Route 214 (Stoddards Wharf Road) in Ledyard CT. The service involves assisting City of Groton - Groton Utilities in establishing two (2) groundwater monitor wells at the location shown on the attached plans. Wells are expected to be installed by use of hollow stem augers, be 45 LF deep, unless shallower refusal is encountered, and constructed of 2" PVC casing and screen. Each well shall have a 10 ft. length of 2-inch PVC Schedule 40 screen with 2" PVC Schedule 40 riser pipe, media sand around the screen, a 2-foot bentonite seal, a steel protective casing set in concrete, and extending approx. 3 FT. to 4 FT. above ground level with a lockable cover.