CityMN
Posted
Oct 12, 2026
Oct 29, 2026
2026 Lead Service Line Replacement RFP
Replacement of lead and galvanized water service lines throughout the city.
Description: Test pitting of water service line pipes to determine the service line material. The work consists of test pitting water service lines to determine their material to comply with the Lead Service Line Replacement Law – P.L.2021, Ch. 183, and includes excavation, by vacuum methods, of up to 1,240 test pits, exposure of the buried water service lines, dewatering (if necessary), identification and photographic documentation of the exposed water service lines, backfilling, compaction, and site restoration.
City · NJ, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalAdjacent opportunities open for bidding right now.
CityMN
Posted
Oct 12, 2026
Oct 29, 2026
Replacement of lead and galvanized water service lines throughout the city.
CityNY
Posted
Oct 9, 2026
Nov 4, 2026
Requesting proposals from qualified engineering firms for the preparation of a Lead Service Line Inventory (LSLI) and Lead Service Line Replacement Plan (LSLRP).
Boulder Farmstead Water Corporation
Special DistrictUT
Posted
Sep 30, 2026
Oct 27, 2026
Work under schedule includes potholing existing service line customer and system side of meter using hydrovac potholing methods. Work under schedule ii includes replacing lead, copper, or galvanized service line with approx 1460 LF of ips service line, 5 CY of landscape repair, 3 SY of concrete flatwork, and related work. Bids will be received for single contract.
CityIL
Posted
Sep 14, 2026
Nov 2, 2026
The City of Rockford Water Division is soliciting sealed, unit-price bids to replace approximately 400 residential lead service lines using open-cut trenching or directional boring, with old lines abandoned in place after connection. The work requires a 5% bid bond, 100% performance and payment bonds, and compliance with Davis-Bacon, Illinois Works, DBE, Build America/Buy America, prevailing-wage, and apprenticeship requirements, and is partly funded by an Illinois EPA loan. A mandatory pre-bid meeting is scheduled for October 6, 2026, and bids are due by November 2, 2026 at 11:00 AM; the estimated duration is about 120 working days.
Decision makers connected to this RFP from Borough of Avalon.