Bill Mckibben Senior Center ADA and Parking Lot Improvements (Invitation to Bid)
Work includes 1 LS of mobilization / demobilization; 3,000 SY of removal of surfacing, 2" pavement section; 3,000 SY of subgrade preparation, 6"; 3,000 SY of basecourse, 6"; 3,000 SY of asphalt paving, 2", complete in place; 18 EA of ADA ramp; 175 SY of concrete sidewalk, 4", 5-foot width; 1 ls of restripe parking lot; 12 EA of ADA parking signs; 43 EA of parking bumper, set in place; 750 SY of subgrade preparation, 6"; 750 SY of basecourse, 6"; 750 SY of asphalt paving, 2", complete in place; 1 LS of stripe parking lot; 1,500 SY of removal of surfacing, 2" pavement section; etc, see attached file.