CityMA
Posted
Sep 23, 2026
Oct 26, 2026
Mapleshade Elementary School Partial Roof Replacement RFP
Consists of the removal and replacement of approximately 37,000 sf of 60 mil pvc fully adhered roof covering. The scope also includes 1/2" coverboard, 2 layers of polyiso (tapered), and mechanically fastened with vapor retarder at sloped roof. Roof edge flashing, masonry flashing, and fascia are also included in this scope of work. The project also includes consideration for a portion of the roof to be structurally upgraded to support future solar panels. This scope would include the installation of structural steel framing in support of the existing wood frame structure. The removal, salvage and reinstallation of acoustic ceiling tiles and grids are required to facilitate the steel framing work. The removal and replacement of approximately 300 lf of brick masonry is also required.
