CityNV
Posted
Oct 2, 2026
Oct 16, 2026
Central Ely Sewer Upgrade Project
Work includes sewer upgrade.
Description: Work includes sewer upgrade.
City · NV, US
Original attachments and procurement documents tied to this bid.
No files attached to this RFP.
Many agencies add documentation later or require FOIA requests. Starbridge can automatically retrieve these files for you.
Request File RetrievalDecision makers connected to this RFP from City of Ely.
Adjacent opportunities open for bidding right now.
CityNV
Posted
Oct 2, 2026
Oct 16, 2026
Work includes sewer upgrade.
Special DistrictMA
Posted
Oct 1, 2026
Oct 23, 2026
Project consists of but not limited to add a vestibule within the community room at the existing rear entrance. Work includes new storefront in 3 openings including 2 power-operated entry doors; addition of hvac equipment for vestibule; expand and modify existing intercom, security, fire alarm, and access control systems including new nvr system; electrical work including interior and exterior lighting
CityMN
Posted
Sep 29, 2026
Dec 8, 2026
The Work shall be completed under one Contract and consists of all labor, skill and materials required to properly construct the Project. The major elements of work associated with the project include, but are not limited to: Demolition of an existing 400 GPM self-priming centrifugal pump, process pipe, fittings, valves, and appurtenances located within the existing pump station; Installation of a new intake structure and intake screen with a capacity of up to 2,000 GPM and located within Burntside Lake; Installation of a new 16", DR11, HDPE gravity transmission pipeline from the new intake screen to the existing pump station located on shore (approx. length of 525 LF); Installation of various buried site ductile iron pipe, fittings, valves, and appurtenances to connect the new intake pipe to the pump station process piping; Installation of various ductile iron process pipe, fittings, valves, and appurtenances inside of the existing pump station to connect the new pump to the suction and discharge piping; Installation of a new vacuum prime assisted self-priming centrifugal raw water pump with a rated capacity of 1,000 GPM including a new variable frequency drive and a new simplex air compressor for the vacuum assist system; Various electrical improvements to provide power to the new raw water pump and appurtenances; Various structural improvements to accommodate installation of the new pump and appurtenances including converting an existing exterior single door to a new double door as well as concrete equipment pads for the new equipment; and Related site work, site grading, rip rap at the shoreline, seeding, and restoration work.
Higher EducationIL
Posted
Sep 30, 2026
Oct 27, 2026
Building E BAS Upgrade Project