ADA Ramp, Walkway and Patio RFP
Posted
Sep 28, 2026
Oct 22, 2026
Remove and reconstruct bituminous driveway. Remove existing bituminous sidewalk and paver underlay. Reconstruct bituminous sidewalk and new steps with ADA compliant handrails. Construct new bituminous sidewalk. Remove and reconstruction bituminous patio. Remove and replace trench drain. Relocate shed. Install shed on new concrete pad. Construction ADA compliant concrete ramp with ADA compliant handrails. Site grading, loam, hydroseed, minor associated site improvements.